x

      Refurbishment of forming section and curing oven 

      23.10.2020

      Refurbishment of forming section and curing oven      

       

      The content of the project was a partial repair of the forming section, where a new flight conveyor was manufactured and installed completely in a stainless steel design, and a more extensive repair of the curing oven. On the curing oven, both flight conveyors, sprocket wheels, bearings, rails of the lower flight conveyor and a small part of rails of the upper flight conveyor were replaced. Doors, transversal and a selected part of longitudinal sealings were also delivered, repaired and replaced. Site manager was Mr. Roman Zadrobílek.

      Tento web používá k poskytování služeb, personalizaci reklam a analýze návštěvnosti soubory cookie. Používáním tohoto webu s tímto souhlasíte.